MIB Panablok Panels allowed us to complete the shell in just 10 weeks, instead of the 22 if traditional blockwork had been installed. We were so pleased that we have since specified MIB Panablok Panels on a number of other projects.
Galway Bay Golf & Country Club, Ken McBride, Building Concepts
The panels on each floor were installed prior to the brickwork providing a watertight structure upon installation of the windows. This allowed finishes to commence earlier in the sequence.
Holiday Inn Express, Richard Upsall, Ballast Wiltshire
A three quarter reduction in the programme period has been achieved on a Balfour Beatty hospital contract through the use of pre-formed panels. The panels have produced a cost saving of 25% for Balfour Beatty, compared with the use of using brick and blockwork, on top of thousands of pounds of savings on preliminaries achieved through reduction in time.
Fazakerely Hospital, Contract Journal
MIB Panablok panels helped us to significantly reduce the time it took to reach a stage whereby we were able to get buildings roofed in and commence the first fix installation.
Giles Dixon, Clarendon Properties

MIB Panablok has received the following accreditation:

 

Warranty and PI Cover
BBA Certificate no. 04/414
BBA Certificate no. 04/414

 

Approved by NHBC and Zurich
Approved by NHBC and Zurich

 

Accredited design backed by ARUP
Accredited design backed by ARUP

 

Unique estimating and design software, ARUP approved

*